| Summary: | [2.7 M3 rc1] lttng-tools ptest facing timeout issue | ||||||
|---|---|---|---|---|---|---|---|
| Product: | [Runtime] General Runtime | Reporter: | yeoh ee peng <ee.peng.yeoh> | ||||
| Component: | General Runtime | Assignee: | Armin Kuster <akuster> | ||||
| Status: | RESOLVED FIXED | QA Contact: | |||||
| Severity: | normal | ||||||
| Priority: | Medium+ | CC: | alex.kanavin, sangeeta.jain | ||||
| Version: | 2.7 | ||||||
| Target Milestone: | 2.6.3 | ||||||
| Hardware: | x86 | ||||||
| OS: | Multiple | ||||||
| Whiteboard: | |||||||
| OS type for building Yocto: | --- | Type of Regression: | --- | ||||
| Verified: | Documentation change: | Don't know | |||||
| Attachments: |
|
||||||
|
Description
yeoh ee peng
2019-04-02 01:46:54 UTC
After applying this patch to ptest-runner: https://lists.yoctoproject.org/pipermail/yocto/2019-April/044725.html the timeout issue is revealed to be here: PASS: tools/notification/test_notification_ust 93 - Subscribe to condition PASS: tools/notification/test_notification_ust 94 - Subscribe to a condition for which subscription was already done ERROR: Exit status is 9 DURATION: 707 TIMEOUT: /usr/lib/lttng-tools/ptest END: /usr/lib/lttng-tools/ptest 2019-04-04T16:54 STOP: /home/root/ptest-runner ptest-runner kills off the tests after 5 minutes of inactivity, so the ptest should be re-run independently and directly, to determine whether the test is truly stuck, or simply needs more than 5 minutes to complete (during which it stays entirely silent). Created attachment 4467 [details]
ptest report
lttng-tools ptest is facing a timeout issue in 2.6.2.rc3. For ptest report, refer attachment. For ptest results, refer following link: https://autobuilder.yocto.io/pub/non-release/20190328-8/testresults/qemux86-64-ptest/ Was fixed in master: http://git.yoctoproject.org/cgit.cgi/poky/commit/?id=8e9a0fe61f0ccdad8d88ecf8f46ae90c0c73da97 May need backport of some work to 2.6? |